Scope of review
The reviewer will only accept assignments within the technical category and any limits recorded in the approved reviewer roster. Each assignment will be issued in writing and identify the design, project, scope, deliverables, review timeframe and reporting arrangements.
Assignments may include:
-
site-specific applications of IPMG-approved model designs under CRLP Group 2B;
-
staged review of the site-specific adaptation where required;
-
review of design revisions or variations within the approved assignment; and
-
site verification where desk review cannot confirm critical assumptions.
-
Calls/meetings with IPMG and (where necessary) with the project teams.
-
The reviewer must be willing and able to travel within Afghanistan where required, subject to UN security arrangements and medical fitness requirements.